top of page

Techport Systems Centre and

Raytheon Building

Osborne, South Australia

Client

Defence SA​

Project Scope

Earthworks, Siteworks, and Stormwater

Project Summary

Earthworks and Site Works package including, but not limited to;

  • Detailed bulk earthworks.

  • Detailed site‐works.

  • Concrete paving.

  • Concrete spoon drains.

  • Kerbing.

  • Pram ramps.

  • Spoon drains.

  • Tactile indicators.

  • Crossovers.

  • Edge restraints.

  • Bitumen paving.

  • Line marking.

  • Rubble preparation under all sealed surfaces.

  • Compaction testing as specified.

Storm‐water works including, but not limited to;

  • Pipe‐work.

  • Sumps and grates.

  • All swales.

  • All ponds.

  • Rain‐garden.

  • Rain‐store harvesting tanks.

  • Head/retainer walls.

  • Rock work.

bottom of page